ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Joint Water Pollution Control Plant Effluent Outfall Tunnel (Min, Yoonkee, Ext.: 1610 — approx. $630,000,000 — $770,000,000)

Plan Holder List

Bid Item Sheet

05/17/18

Mandatory
06/12/18
09:00 AM

10/09/18

11/14/18

1900

Lancaster Water Reclamation Plant Eastern Agricultural Site Groundwater Extraction Wells Installation-Direct Mud Method (Pegadiotes, Stan, Ext.: 2705 — approx. $2,500,000 — $3,500,000)

Plan Holder List

Bid Item Sheet

06/28/18

N/A

08/02/18

08/13/18

150

Lancaster WRP Eastern Agricultural Site Groundwater Extraction Wells Installation-Reverse Circulation Method (Pegadiotes, Stan, Ext.: 2705 — approx. $2,000,000 — $3,000,000)

Plan Holder List

Apparent Low Bidder - Well Industries, Inc. (dba North State Drilling) ($2,651,650.00)

Bid Item Sheet

Bid Results

06/28/18

N/A

08/02/18

08/13/18

150

Puente Hills Materials Recovery Facility Building Modifications (Fischer, Melissa, Ext.: 2112 — approx. $3,500,000 — $5,500,000)

Plan Holder List

Apparent Low Bidder - Metro Builders & Engineers Group, Ltd. ($6,781,191.00)

Bid Item Sheet

Bid Results

07/12/18

Mandatory
07/31/18
08:00 AM

08/28/18

09/26/18

260

Shoemaker Avenue Trunk Sewer Rehabilitation Between MH 18 0293 and MH 18 0292 (Palencia, Perry, Ext.: 6806 — approx. $41,000 — $69,000)

Plan Holder List

Apparent Low Bidder - Sancon Technologies, Inc. ($74,560.00)

Bid Item Sheet

Bid Results

08/03/18

N/A

08/21/18

09/26/18

55

Joint Water Pollution Control Plant Power Service For Construction Of The Effluent Outfall Tunnel (Figuerres, Rey Philip, Ext.: 2002 — approx. $848,000 — $1,270,000)

Plan Holder List

Bid Item Sheet

08/09/18

Mandatory
08/30/18
10:00 AM

09/20/18

10/10/18

200

Valencia Water Reclamation Plant Advanced Water Treatment Facility (Drorbaugh, Donald, Ext.: 2176 — approx. $72,000,000 — $88,000,000)

Plan Holder List

Bid Item Sheet

08/16/18

Mandatory
08/30/18
10:00 AM

12/04/18

01/09/19

850

Los Coyotes Water Reclamation Plant Power Distribution System Modifications (Figuerres, Rey Philip, Ext.: 2002 — approx. $23,000,000 — $31,100,000)

Plan Holder List

Bid Item Sheet

08/23/18

Mandatory
09/06/18
10:00 AM

10/18/18

11/14/18

600


JOINT WATER POLLUTION CONTROL PLANT EFFLUENT OUTFALL TUNNEL(Mandatory walk-through location: Carson Field Office Parking Lot, 24501 S. Figueroa Street, Carson, CA 90745) — The work consists of constructing approximately 36,750 feet of 18-foot internal diameter precast concrete segmental lining tunnel, a 14-foot diameter connecting pipe, an approximately 60-foot diameter tunnel shaft, junction structure, manifold structure and two valve structures, and all appurtenant work.
LANCASTER WATER RECLAMATION PLANT EASTERN AGRICULTURAL SITE GROUNDWATER EXTRACTION WELLS INSTALLATION-DIRECT MUD METHOD — The work consists of the construction of three (3) 16-inch diameter, 1,400-foot deep groundwater extraction wells by direct mud drilling, each including a vertical turbine pump, discharge head, right angle pump drive, diesel exhaust fluid tank, reinforced concrete pad, fencing, and all appurtenant work, located within District's property between 70th Street East and 90th Street East and between Avenue E and Avenue G in unincorporated Los Angeles County, northeast of the City of Lancaster, California. **NOTE: PROJECT DURATION IS 150 CALENDAR DAYS NOT WORK DAYS.**
LANCASTER WRP EASTERN AGRICULTURAL SITE GROUNDWATER EXTRACTION WELLS INSTALLATION-REVERSE CIRCULATION METHOD — The work consists of the construction of three (3) 16-inch diameter, 1,400-foot deep groundwater extraction wells by reverse circulation drilling, each including a vertical turbine pump, discharge head, right angle pump drive, diesel exhaust fluid tank, reinforced concrete pad, fencing, and all appurtenant work, located within District's property between 70th Street East and 90th Street East and between Avenue E and Avenue G in unincorporated Los Angeles County, northeast of the City of Lancaster, California. **NOTE: PROJECT DURATION IS 150 CALENDAR DAYS NOT WORK DAYS.**
PUENTE HILLS MATERIALS RECOVERY FACILITY BUILDING MODIFICATIONS(Mandatory walk-through location: Puente Hills Materials Recovery Facility, 2808 Workman Mill Road, Whittier, CA 90601 (Time: 8:00 a.m. to 12:00 p.m.)) — The work consists of demolition of concrete structures and push walls, earthwork, construction of concrete structures and steel push walls, repair of concrete walls, engineering and installation of HVAC systems, engineering and installation of fire suppression system, electrical work, and all appurtenant work.
SHOEMAKER AVENUE TRUNK SEWER REHABILITATION BETWEEN MH 18 0293 AND MH 18 0292 — The work consists of rehabilitation of approximately 101 feet of existing 10-inch diameter vitrified clay pipe VCP, and all appurtenant work. The project is located in the City of Santa Fe Springs in Shoemaker Avenue south of Imperial Highway.
JOINT WATER POLLUTION CONTROL PLANT POWER SERVICE FOR CONSTRUCTION OF THE EFFLUENT OUTFALL TUNNEL(Mandatory walk-through location: JWPCP Tunnel Site, 1701 N. Figueroa St., Wilmington, CA 90744) — The project consists of the installation of proposed Los Angeles Department of Water and Power customer station. Work includes installation of concrete foundations, 38-kV switchgear, battery enclosure, duct banks and all appurtenant work.
VALENCIA WATER RECLAMATION PLANT ADVANCED WATER TREATMENT FACILITY(Mandatory walk-through location: Valencia Water Reclamation Plant, 28185 The Old Road, Valencia, CA 91355) — The work consists of construction of an advanced water treatment facility (microfiltration, nanofiltration, enhanced membrane system), metal building, electrical and control room, electrical substation and transformers for a new power service, duct banks and electrical conduit, underground utilities, instrumentation and piping systems, fire prevention systems, above ground tanks (concrete, plastic, steel), concrete structures, truck loading station, pump stations, asphalt roads, chemical storage and cleaning systems, metal canopies, site improvements, and all appurtenant work.
LOS COYOTES WATER RECLAMATION PLANT POWER DISTRIBUTION SYSTEM MODIFICATIONS (Mandatory walk-through location: Los Coyotes WRP, 16515 Piuma Avenue, Cerritos, CA 90703) — The work consists of replacement of the plant’s electrical power system and upgrading to a redundant design. The scope of work includes replacement of Southern California Edison service with an upgraded fully redundant system; construction of two new masonry electrical buildings; installation of medium and low voltage power distribution equipment, diesel-engine generators, underground electrical duct banks, and all appurtenant work.