Listing of Advertised Projects

LAST UPDATED: SEPTEMBER 10, 2019

ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Claremont Outfall Trunk Sewer Rehabilitation (Hsu, Jenny, Ext.: 1618 — approx. $1,600,000 — $2,500,000)

Plan Holder List

Apparent Low Bidder - Nu-Line Technologies, LLC ($1,172,893.00)

Bid Item Sheet

Bid Results

08/01/19

Mandatory
08/21/19
10:00 AM

09/03/19

09/25/19

200

San Jose Creek East Water Reclamation Plant Electrical Rooms 1 and 2 HVAC Installation (Hope, Greg, Ext.: 3538 — approx. $125,000 — $225,000)

Plan Holder List

Apparent Low Bidder - Air Conditioning Estimators, Inc. ($195,600.00)

Bid Item Sheet

Bid Results

07/25/19

Mandatory
08/08/19
10:00 AM

08/29/19

09/25/19

120


CLAREMONT OUTFALL TRUNK SEWER REHABILITATION(Mandatory walk-through location: 1451 Whittier Ave., Claremont, CA 91711) — The work consists of rehabilitating approximately 13,198 feet of existing 12-inch and 15-inch diameter corroded non-reinforced concrete pipe (NRCP) on the Claremont Outfall Trunk Sewer, Claremont Connection Trunk Sewer, San Antonio Trunk Sewer, and the San Antonio Relief Trunk Sewer with cured-in-place pipe (CIPP) liners. The project will also rehabilitate fifty-four (54) existing manholes with calcium aluminate cement, and all appurtenant work. The project comprises three (3) segments located within the cities of Claremont and Pomona. One (1) segment begins near the intersection of San Bernardino Avenue and Singingwood Avenue, then trends northeasterly through public and private right of ways, and ends west of the intersection of Wharton Drive and Bucknell Avenue. One (1) segment begins at the intersection of Arrow Highway and Towne Avenue, then easterly on Arrow Highway, and ends at the intersection of Arrow Highway and Mountain Avenue. One (1) begins at the intersection of Foothill Boulevard and Towne Avenue, then trends northeasterly through public and private right of ways, and ends north of the intersection of Kent Drive and Whittier Avenue.
SAN JOSE CREEK EAST WATER RECLAMATION PLANT ELECTRICAL ROOMS 1 AND 2 HVAC INSTALLATION(Mandatory walk-through location: Joint Administration Office (Lobby), 1955 Workman Mill Road, Whittier, CA 90601) — The work consists of furnishing and installation of HVAC equipment and ducting, including appurtenant electrical work and equipment pads; modification to existing structures and equipment supports; and all associated materials, equipment, and all appurtenant work.