Listing of Advertised Projects

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

ATTENTION PROSPECTIVE BIDDERS The Bid Documents may be obtained from Quest Construction Data Network (QuestCDN). The Districts has only authorized QuestCDN to distribute the Bid Documents, in electronic formats, for use by bidders. The Districts does not warrant the accuracy or completeness of Bid Documents obtained from any source other than QuestCDN, unless otherwise noted, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders’ risk. Only those bidders that have obtained and properly downloaded the Bid Documents from QuestCDN will appear on the Planholders list and may submit a bid.

To obtain and download electronic Bid Documents, Plan Holders List, and Project Bid Results on QuestCDN for the projects listed below, click here.

For technical questions concerning plans and specifications and/or further information regarding the status of a specific project, contact the listed Project Manager via email or phone at (562) 908-4288.  For assistance in downloading and working with the digital project information, please contact QuestCDN Customer Support at (952) 233-1632 or info@questcdn.com

Puente Hills Materials Recovery Facility Modification of the Stormwater Capture System

  • Category:Construction Bids
  • Project Number:85D-G-0011
  • Post/Advertise Date:05/12/2026
  • Bid Date:06/23/2026 2:00 PM

Dollar Range:  Approx. $525,000 to $875,000

Contact

Irene Chang, Ext. 2175
Email: ichang@lacsd.org

Advertise:  5/12/2026

Walk-Through: 5/28/2026 (MANDATORY) @ 10:00 A.M.
                            Location: 2800 Workman Mill Rd, Whittier, CA 90601

Bid:  6/23/2026 @ 2:00 P.M.

Award:  7/22/2026

Working Days: 180

Obtain and download electronic Bid Documents, Plan Holders List, and Project Bid Results on Quest Construction Data Network (QuestCDN).

This project will improve the performance of the existing stormwater capture system to minimize stormwater monitoring and sampling frequency. The project includes replacing and upsizing the existing 15 hp storm water pump to 25 hp submersible pump at Drainage Area 3, installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing 170 linear feet of 10-inch PVC pipe.