Sorry, this page has moved!
Please click here to go to the new location.

Figures for the Final JOS 2010 Master Facilities Plan (June 1995)

LIST OF FIGURES

Figure ES-1 Sanitation Districts of Los Angeles County Map
Figure ES-2 Recommended Project

Figure 1.2-1 Joint Outfall System

Figure 2.1-1 Major Geographic and Topographic Features of the JOS Service Area
Figure 2.1-2 Regional Geology of the JOS Area
Figure 2.1-3 Faults in the JOS Service Area
Figure 2.1-4 Rainfall Hyetograph of the JOS Area
Figure 2.1-5 Major Surface Waters of the JOS
Figure 2.1-6 The San Gabriel River and Tidal Prism
Figure 2.1-7 Groundwater Contour Map of the JOS Service Area
Figure 2.1-8 Soil Map of the JO
Figure 2.4-1 Land Use Designations for the JWPCP Site and Vicinity
Figure 2.4-2 Zoning Designations for the JWPCP Site and Vicinity
Figure 2.4-3 County of Los Angeles Land Use Designations for the SJCWRP and Vicinity
Figure 2.4-4 County of Los Angeles Zoning Designations for the SJCWRP and Vicinity
Figure 2.4-5 City of Cerritos Land Use Designations for the LCWRP and Vicinity
Figure 2.4-6 City of Cerritos Zoning Designations for the LCWRP and Vicinity
Figure 2.4-7 County of Los Angeles Land Use Designations for the WNWRP Site and Vicinity
Figure 2.4-8 County of Los Angeles Zoning Designations for the WNWRP and Vicinity
Figure 2.4-9 City of Long Beach Land Use Designations for LBWRP Site and Vicinity
Figure 2.4-10 City of Long Beach Zoning Designations for LBWRP Site and Vicinity
Figure 2.4-11 City of Pomona Land Use Designations for PWRP Site and Vicinity
Figure 2.4-12 Cityof Pomona Zoning Designations for PWRP Site and Vicinity
Figure 2.5-1 Major Water Conveyance Facilities in California
Figure 2.5-2 The Metropolitan Water District of Southern California
Figure 2.5-3 Water Demands in the MWD Service Area
Figure 2.5-4 Summary Impacts of Mineral and Organic Constituents on Groundwater Supply in Metropolitan's Service Area
Figure 2.5-5 Major River Systems and Reservoirs in Southern California
Figure 2.5-6 MWD Water Supply and Demand in 2010: Average Year Condition
Figure 2.5-7 MWD Water Supply and Demand in 2010: Critical Dry Year Condition
Figure 2.6-1 Boundaries of the South Coast Air Basin
Figure 2.7-1 Southern California Energy Consumption

Figure 4.1-1 Joint Water Pollution Control Plant Flow Diagram 1994
Figure 4.1-2 Existing Effluent Management. EY 1993-94
Figure 4.1-3 Typical Treatment Schematic for the JOS Water Reclamation Plants
Figure 4.1-4 Existing Facilities Identified in JOS 2010 Master Facilities Plan
Figure 4.1-5 Joint Outfall Trunk Sewer Systems

Figure 5.2-1 SCAG Planning Subregions
Figure 5.2-2 Joint Outfall System Treatment Plant Drainage Areas
Figure 5.2-3 JOS 2010 Growth Forecast
Figure 5.4-1 Historical Quantities of Solids Entering JWPCP
Figure 5.4-2 Projected Solids Entering JWCP
Figure 5.4-3 Projected JOS Biosolids for Reuse or Disposal
Figure 5.5-1 Joint Outfall System Flow, 1937-1993
Figure 5.5-2 WRPs Reuse and Effluent Flows
Figure 5.5-3 Joint Outfall System Reuse Flows, 1960-1993
Figure 5.5-4 LBWRP Reuse Sites, 1992-93
Figure 5.5-5 LCWRP Reuse Sites, City of Cerritos, 1992-93
Figure 5.5-6 LCWRP Reuse Sites, City of Lakewood, 1992-93
Figure 5.5-7 LCWRP Reuse Sites, Central Basin Municipal Water District Century Water Reclamation Project Distribution System, 1992-93
Figure 5.5-8 PWRP Reuse Sites, City of Pomona Water Department Reclaimed Water Distribution System, 1992-93
Figure 5.5-9 PWRP Reuse Sites, Walnut Valley Water District, Reclaimed Water Distribution System, 1992-93
Figure 5.5-10 SJCWRP Reuse Sites, 1992-93
Figure 5.5-11 WNWRP Reuse Sites, 1992-93

Figure 6.1-1 JOS 2010 Facilities Plan Alternatives Development and Evaluation
Figure 6.12-1 JWPCP, Proposed Facilities Common to All Project Alternatives
Figure 6.12-2 JWPCP, Location of Former Sludge Beds and Rag Pits
Figure 6.12-3 JWPCP, Proposed Wastewater Treatment Facilities, 400 MGD Option
Figure 6.12-4 Proposed Treatment Facilities: Alternative 1
Figure 6.12-5 Footprint of Proposed Facilities at the SJCWRP: 125 MGD
Figure 6.12-6 Footprint of Proposed Facilities at the LCWRP: 50 MGD
Figure 6.12-7 Tentative Phasing of Proposed JOS Facilities: Alternative 1
Figure 6.12-8 Proposed Treatment Facilities: Alternative 2
Figure 6.12-9 Footprint of Proposed Facilities at the LCWRP: 75 MGD
Figure 6.12-10 Tentative Phasing of Proposed JOS Facilities: Alternative 2
Figure 6.12-11 Proposed Treatment Facilities: Alternative 3
Figure 6.12-12 Footprint of Proposed Facilities at the WNWRP: 52.5 MGD
Figure 6.12-13 Tentative Phasing of Proposed JOS Facilities: Alternative 3
Figure 6.12-14 JWPCP, Proposed Wastewater Treatment Facilities: 350 MGD Option
Figure 6.12-15 Proposed Treatment Facilities: Alternative 4
Figure 6.12-16 Footprint of Proposed Facilities at the LCWRP: 62.5 MGD
Figure 6.12-17 Tentative Phasing of Proposed JOS Facilities: Alternative 4
Figure 6.13-1 County of Los Angeles, Recycled Water Projects, May 1993

Figure 7.1-1 JWPCP, Proposed Secondary Treatment Facilities, 400 MGD Option
Figure 7.1-2 LACSD Engineering Design and Construction Schedule for JWPCP