Listing of Advertised Projects

LAST UPDATED: NOVEMBER 09, 2017

ATTENTION PROSPECTIVE BIDDERS: The Bid Documents may be obtained by contacting the Sanitation District's Public Counter at (562) 908-4288, extension 1205. The Sanitation District does not warrant the accuracy or completeness of Bid Documents obtained from any source other than the Sanitation District's Public Counter, and any use of such documents by prospective bidders or others for any purpose is solely at the bidders' risk.

For technical questions concerning the plans and specifications and/or further information regarding the status of a particular project, contact the Project Manager at the extension number provided at (562) 908-4288.

PROJECT NAME /
DOLLAR RANGE

ADVERTISE

WALK-
 THROUGH 

BID

AWARD

WORKING
DAYS

Downey Area Recycling and Transfer Station Storm Water Capture (Derek Zondervan, Ext.: 2107 — approx. $600,000 — $1,000,000)

Plan Holder List

Bid Item Sheet

10/12/17

Mandatory
10/26/17
09:30 AM

11/28/17

12/27/17

140

Long Beach Water Reclamation Plant Concrete and Protective Lining Repair-Phase II (Donald Drorbaugh, Ext.: 2176 — approx. $8,300,000 — $10,300,000)

Plan Holder List

Bid Item Sheet

11/02/17

Mandatory
11/16/17
10:00 AM

12/14/17

01/10/18

470

Puente Hills Materials Recovery Facility Storm Water Capture (Joseph Smisko, Ext.: 2105 — approx. $2,900,000 — $3,900,000)

Plan Holder List

Bid Item Sheet

11/09/17

Mandatory
11/30/17
09:30 AM

12/28/17

01/24/18

170


DOWNEY AREA RECYCLING AND TRANSFER STATION STORM WATER CAPTURE — The project will install a stormwater collection system. The work will include installation of a stormwater lift station, above-ground storage tanks, the associated piping, electrical, and instrumentation systems, asphalt and concrete paving, and all appurtenant work.
LONG BEACH WATER RECLAMATION PLANT CONCRETE AND PROTECTIVE LINING REPAIR-PHASE II(Mandatory walk-through location: 7400 E. Willow Street, Long Beach, CA 90815) — The project will repair corroded concrete surfaces and replace the plastic lining in an influent pump station wetwell and tank channels; replace aluminum odor control covers; repair concrete walls; replace return activated sludge piping; and all other appurtenant work. The project will require extensive by-pass pumping systems.
PUENTE HILLS MATERIALS RECOVERY FACILITY STORM WATER CAPTURE(Mandatory walk-through location: Puente Hills Materials Recovery Facility, 2808 Workman Mill Road, Whittier, CA 90601) — The work includes installation of four storm water lift stations, one storm water storage basin, transfer pumps, valves and piping, instrumentations, and all appurtenant work.